Alleys Under Construction

Improving the Downtown Experience

The DDA’s Alley Master Plan is a long term plan to tap into the potential for enhanced pedestrian connections, improved drainage, trash and recycling, and the opportunity to create festive spaces that feature unique lighting, painting, art installations and seating.

Downtown Alleys Under Construction

Two alleys are currently under construction. Front door access to all businesses will be maintained during the project. Thank you for your patience.

The Old Firehouse East/Seckner Alleys and West Mountain Alley are part of the DDA’s Alley Master plan – a long term plan to tap into the potential for enhanced pedestrian connections, improved drainage, trash and recycling, and the opportunity to create festive spaces featuring unique lighting, plantings, art installations, and seating.

Old Firehouse East/Seckner Alleys: April-November 2018

With increased pedestrian and business traffic between Prost Brewing and the Elizabeth Hotel, it is the perfect time to create Fort Collins’ next beautiful alley!

West Mountain Avenue Alley: April-November 2018

Tucked between Mountain Ave. and Oat St., the West Mountain Avenue Alley is heavily used by vehicles, delivery services, and pedestrians. The construction will greatly improve everyone’s experience whether you are taking a shortcut to your favorite business, or parking your car in the updated surface lot.

Want to stay up-to-date on the latest Alley project? Click the button below to sign up for the latest news by email!

Sign Up for Project Updates

Contact

Todd Dangerfield, DDA Project Manager
Office: 970.419.8254
Cell: 970.237.9746
tdangerfield@fcgov.com

Contact Us

General Info
Tel: 970-484-2020
oldtownsq@fcgov.com

Mailing Address:
19 Old Town Square, Suite 230
Fort Collins, CO 80524

Location

19 Old Town Square, Fort Collins, CO 80524
(970) 484-2020

Connect with us